This was achieved through the implementation of Slim4. Moreover, employee effiency increased significantly, only 3,5 FTE are now needed for the planning. Based on the excellent results in the Netherlands, Phoenix Contact decided to roll out Slim4 internationally. As part of this strategy, Slim4 is currently implemented in their subsidary in China, Japan an the USA.
Slim4 can easily interface with Baan systems. Implementation takes on average less then 25 days over a period of less than 3 months; this includes specification, adapting the interface, testing and complete user training. Significant results that can be achieved are;
|
|||||
Slimstock news:
Rituals aims at significantly improving their service level with Slim4.
Sectors:
- Automotive- Components
- DIY
- Wholesale
- Pharma
- Manufacturer
- Retail
- Sanitary
- Spare Parts
- Steel

